Fast, reliable migration from legacy PLCs to modern platforms with minimal downtime.
Modernize Without the Headaches
Upgrading from PLC5 or SLC-500 systems doesn’t have to disrupt your operations. At Ohmega Solutions, we make migrations smooth, structured, and fast — with full conversion of logic, tag structure, and hardware. We’ve upgraded dozens of legacy Allen-Bradley systems to modern platforms like ControlLogix, and we tailor each migration to minimize downtime and risk.
- Hardware and I/O panel upgrades
- Pre- and post-migration testing and validation
- Documentation and user training packages
Frequently Asked Question
It depends on complexity, but our structured approach allows us to complete most upgrades with minimal downtime — often over a weekend.
No. We preserve and convert your existing logic and tag structures to the new platform, ensuring functional continuity.
Yes — parts availability is decreasing rapidly. Upgrading now prevents emergency failures and prepares you for future growth.
Yes. We often update visualization and control systems alongside the PLC upgrade for a complete modernization.